Step One
The dealer will visit your home and stake out the site for your new pool.
He'll also begin getting the necessary permits.
Step Two
Step two is digging the hole. You'll want to point out any areas you want protected and your dealer will make sure that any underground cables and pipelines are located and avoided. A word to the wise: Don't be shocked when the backhoe arrives. It will only be needed to dig the hole.
Step Three
Step three is setting, leveling and plumbing the substructure. Your Fort Wayne Pools wall panels will be either non-corrosive structural polymer or corrosion-resistant steel.
Step Four
After the substructure is set, the shallow and deep ends will be formed and smoothed.
Step Five
Next the concrete footer should be poured, securing the substructure in place.
Step Six
Once everything is roughed in, back fill is added behind the wall.
Step Seven
Step seven is the pouring, troweling, sculpting and leveling of the pool floor.
Step Eight
The vinyl liner is put in place and set in the coping track. A vacuum is positioned behind the liner to hold it in place as the pool is being filled with water.
Step Nine
With the liner now in place and water continuing to be added, holes are cut for hardware and accessories and the water filtration system is plumbed.
Step Ten
The finishing touches. Add the deck and patio, music, landscaping and there you have it - an open air rec room - right in your back yard.